Trafford Palazzo DC (Stretford) · evyve
Type 2 · 22 kW51% reliability2 of 4 available
CCS · 75 kW99% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 75 kW | £0.85/kWh |
| CHAdeMO | 75 kW | £0.85/kWh |
| CCS | 45 kW | £0.85/kWh |
| Type 2 | 22 kW | £0.55/kWh |
How much does it cost to charge at Trafford Palazzo DC (Stretford) · evyve?
The operator's published price is CCS £0.85/kWh · Type 2 £0.55/kWh · CCS £0.85/kWh · CHAdeMO £0.85/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Trafford Palazzo DC (Stretford) · evyve?
Up to 75 kW DC via CCS, Type 2, CHAdeMO.
How many charging sockets does Trafford Palazzo DC (Stretford) · evyve have?
8 charging sockets: 2 × 75 kW CCS, 4 × 22 kW Type 2, 1 × 45 kW CCS, 1 × 75 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Trafford Palazzo DC (Stretford) · evyve open 24/7?
Yes - Trafford Palazzo DC (Stretford) · evyve is open 24 hours a day, 7 days a week.
When is Trafford Palazzo DC (Stretford) · evyve busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 7 am. The live status on this page shows what is free before you set off.
How reliable is Trafford Palazzo DC (Stretford) · evyve?
Amp Map measured 75.5% uptime here from recorded live status over the last 30 days, across 470 observed charging sessions.
Who operates Trafford Palazzo DC (Stretford) · evyve?
Trafford Palazzo DC (Stretford) · evyve is on the evyve network.
How long does a Tesla Model Y Long Range take to charge at Trafford Palazzo DC (Stretford) · evyve?
A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Trafford Palazzo DC (Stretford) · evyve?
A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Trafford Palazzo DC (Stretford) · evyve?
A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.