Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
FullVerifiedFastned supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Redbridge Park & Ride · Fastned

Abingdon Road, OX1 4XG · Open 24h
Rate this charger
Network: Fastned
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 300 kW100% reliability0 of 7 available
4402001100% reliabilityBlocked
4402003100% reliabilityBlocked
4402005100% reliabilityBlocked
4402007100% reliabilityBlocked
4402008100% reliabilityBlocked
4402009100% reliabilityBlocked
4402010100% reliabilityBlocked
CCS / CHAdeMO · 300 kW100% reliability0 of 2 available
4402002100% reliabilityBlocked
4402006100% reliabilityBlocked
4402004CHAdeMO / CCS · 300 kW100% reliabilityBlocked

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.79/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
ParkingCar park
Energy100% renewable energy
PaymentCredit cardApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 1pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Redbridge Park & Ride · Fastned?

The operator's published price is £0.79/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Redbridge Park & Ride · Fastned?

Up to 300 kW DC via CCS, CHAdeMO.

How many charging sockets does Redbridge Park & Ride · Fastned have?

10 charging sockets: 10 × 300 kW CCS, 3 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Redbridge Park & Ride · Fastned open 24/7?

Yes - Redbridge Park & Ride · Fastned is open 24 hours a day, 7 days a week.

When is Redbridge Park & Ride · Fastned busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Redbridge Park & Ride · Fastned?

Amp Map measured 99.9% uptime here from recorded live status over the last 30 days, across 925 observed charging sessions.

Who operates Redbridge Park & Ride · Fastned?

Redbridge Park & Ride · Fastned is on the Fastned network.

How long does a Tesla Model Y Long Range take to charge at Redbridge Park & Ride · Fastned?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Redbridge Park & Ride · Fastned?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Redbridge Park & Ride · Fastned?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min · ≈ 55 kWh · ~£44
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min · ≈ 40 kWh · ~£32
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min · ≈ 51 kWh · ~£40
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min · ≈ 51 kWh · ~£40
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min · ≈ 43 kWh · ~£34
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min · ≈ 41 kWh · ~£32
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Data: Fastned · synced 13 Oct 2026