Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 26 Aug 2021

NRP Public Carpark Customer Charging · Evolt

NRP Public Carpark, NR4 7UQ
Rate this charger
Network: Evolt
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 27 kW18 sockets
Type 222 kW18 sockets
Location info
Price£0.30 / kWh. Parking fees apply
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · pay at location
NotesPayment via https://webpay.swarcoeconnect.org/ or membership RFIDs
Getting thereEntry via west-side of multi-storey car park, 6 charging bays each on floors 1, 2 and 3
Facilities
Car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at NRP Public Carpark Customer Charging · Evolt?

The operator's published price is £0.30 / kWh. Parking fees apply. Prices come from the operator's own data feed and can change.

How fast is charging at NRP Public Carpark Customer Charging · Evolt?

Up to 22 kW AC via Type 2.

How many charging sockets does NRP Public Carpark Customer Charging · Evolt have?

18 charging sockets: 18 × 7 kW Type 2, 18 × 22 kW Type 2.

Who operates NRP Public Carpark Customer Charging · Evolt?

NRP Public Carpark Customer Charging · Evolt is on the Evolt network. For site issues, the operator lists +448082813508.

How long does a Tesla Model Y Long Range take to charge at NRP Public Carpark Customer Charging · Evolt?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at NRP Public Carpark Customer Charging · Evolt?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at NRP Public Carpark Customer Charging · Evolt?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 26 Aug 2021