Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 23 Mar 2023

Howard Street · Evolt

Howard Street, SK13 8HS
Rate this charger
Network: Evolt
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CCS100 kW2 sockets
CCS100 kW2 sockets
Location info
Price£0.79/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · membership required · access key required
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Howard Street · Evolt?

The operator's published price is £0.79/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Howard Street · Evolt?

Up to 100 kW DC via CCS.

How many charging sockets does Howard Street · Evolt have?

4 charging sockets: 2 × 100 kW CCS, 2 × 100 kW CCS.

Who operates Howard Street · Evolt?

Howard Street · Evolt is on the Evolt network. For site issues, the operator lists +448082813508.

How long does a Tesla Model Y Long Range take to charge at Howard Street · Evolt?

A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Howard Street · Evolt?

A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Howard Street · Evolt?

A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 100 kW CCS~36 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 100 kW CCS~29 min
Audi Q4 e-tron 50 10–80% · 100 kW CCS~43 min
Hyundai IONIQ 5 10–80% · 100 kW CCS~32 min
MG Motor MG4 Trophy 10–80% · 100 kW CCS~34 min
Hyundai Kona Electric Long Range 10–80% · 100 kW CCS~40 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 23 Mar 2023