Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 14 Jun 2019

Stone House Hotel · EVBox

Sedbusk, DL8 3PT
Rate this charger
Network: EVBox
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 24 kW2 sockets
Location info
Pricefrom £1.75 per hour
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · pay at location
NotesPlease go to hotel reception to purchase charging tokens (2 hours per token - max 8 hours). Reception open daily 8am to 10pm. Discounts available for hotel guests.
Getting therePlease follow signs for Stone House Hotel (half a mile from Hawes).
Facilities
Hotel / inn
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Stone House Hotel · EVBox?

The operator's published price is from £1.75 per hour. Prices come from the operator's own data feed and can change.

How fast is charging at Stone House Hotel · EVBox?

Up to 4 kW AC via Type 2.

How many charging sockets does Stone House Hotel · EVBox have?

2 charging sockets: 2 × 4 kW Type 2.

Who operates Stone House Hotel · EVBox?

Stone House Hotel · EVBox is on the EVBox network. For site issues, the operator lists 01969667571.

How long does a Tesla Model Y Long Range take to charge at Stone House Hotel · EVBox?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stone House Hotel · EVBox?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Stone House Hotel · EVBox?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 4 kW Type 2~13h 50m
Tesla Model 3 Rear-Wheel Drive 10–80% · 4 kW Type 2~9h 59m
Audi Q4 e-tron 50 10–80% · 4 kW Type 2~12h 46m
Hyundai IONIQ 5 10–80% · 4 kW Type 2~12h 42m
MG Motor MG4 Trophy 10–80% · 4 kW Type 2~10h 40m
Hyundai Kona Electric Long Range 10–80% · 4 kW Type 2~10h 9m
Nissan LEAF 10–80% · 4 kW Type 2~7h 0m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 14 Jun 2019