EV Moy
CCS · 75 kW98% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How fast is charging at EV Moy?
Up to 75 kW DC via CCS.
How many charging sockets does EV Moy have?
2 charging sockets: 2 × 75 kW CCS. Live per-socket availability is shown on this page.
Is EV Moy open 24/7?
Yes - EV Moy is open 24 hours a day, 7 days a week.
When is EV Moy busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 9 pm. The live status on this page shows what is free before you set off.
How reliable is EV Moy?
Amp Map measured 97.9% uptime here from recorded live status over the last 30 days, across 23 observed charging sessions.
Who operates EV Moy?
EV Moy is on the EV Moy network.
How long does a Tesla Model Y Long Range take to charge at EV Moy?
A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EV Moy?
A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EV Moy?
A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.