Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 8 Mar 2023

Westbourne Park Road · ESB Energy

Westbourne Park Road, W2 5QL
Rate this charger
Network: ESB Energy
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CHAdeMO50 kW1 socket
Type 250 kW1 socket
Location info
AccessPublic · pay at location
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Westbourne Park Road · ESB Energy?

Up to 50 kW DC via CHAdeMO, Type 2.

How many charging sockets does Westbourne Park Road · ESB Energy have?

2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.

Who operates Westbourne Park Road · ESB Energy?

Westbourne Park Road · ESB Energy is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.

How long does a Tesla Model Y Long Range take to charge at Westbourne Park Road · ESB Energy?

A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Westbourne Park Road · ESB Energy?

A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Westbourne Park Road · ESB Energy?

A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW Type 2~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW Type 2~50 min
Audi Q4 e-tron 50 10–80% · 50 kW Type 2~66 min
Hyundai IONIQ 5 10–80% · 50 kW Type 2~64 min
MG Motor MG4 Trophy 10–80% · 50 kW Type 2~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW Type 2~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 8 Mar 2023