Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 17 May 2024

Brunel Street Car Park Birmingham · ESB Energy

Brunel Street, B5 4AF
Rate this charger
Network: ESB Energy
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 222 kW1 socket
Type 222 kW1 socket
CCS50 kW1 socket
CHAdeMO44 kW1 socket
Type 222 kW1 socket
CHAdeMO44 kW1 socket
CCS50 kW1 socket
Type 222 kW1 socket
Location info
AccessPublic · pay at location
Getting thereReserved section immediately on right of entry. Parking fees apply. Fitted under Midlands PiP
Facilities
Car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Brunel Street Car Park Birmingham · ESB Energy?

Up to 50 kW DC via Type 2, CCS, CHAdeMO.

How many charging sockets does Brunel Street Car Park Birmingham · ESB Energy have?

8 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 44 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 44 kW CHAdeMO, 1 × 50 kW CCS, 1 × 22 kW Type 2.

Who operates Brunel Street Car Park Birmingham · ESB Energy?

Brunel Street Car Park Birmingham · ESB Energy is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.

How long does a Tesla Model Y Long Range take to charge at Brunel Street Car Park Birmingham · ESB Energy?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Brunel Street Car Park Birmingham · ESB Energy?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Brunel Street Car Park Birmingham · ESB Energy?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 44 kW CHAdeMO~56 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 17 May 2024