Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 5 of 5VerifiedEnozzle Ltd - Llandudno Bay Hotel site supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Enozzle Ltd - Llandudno Bay Hotel site

E Parade, LL30 1BE · Open 24h
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 22 kW100% reliability4 of 4 available
Bay 1100% reliabilityAvailable
Bay 2100% reliabilityAvailable
Bay 3100% reliabilityAvailable
Bay 4100% reliabilityAvailable
Bay 5CCS · 50 kW100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
HoursOpen 24 hours
ParkingCar park
BaysEV-only bays · Must stay plugged in while parked
Energy80% renewable energy
PaymentApp start/stopRFID card
Facilities
Hotel / inn
6am9am12pm3pm6pm9pm
From live status history · busiest around 11am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Enozzle Ltd - Llandudno Bay Hotel site?

Up to 50 kW DC via Type 2, CCS.

How many charging sockets does Enozzle Ltd - Llandudno Bay Hotel site have?

5 charging sockets: 4 × 22 kW Type 2, 1 × 50 kW CCS. Live per-socket availability is shown on this page.

Is Enozzle Ltd - Llandudno Bay Hotel site open 24/7?

Yes - Enozzle Ltd - Llandudno Bay Hotel site is open 24 hours a day, 7 days a week.

When is Enozzle Ltd - Llandudno Bay Hotel site busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Enozzle Ltd - Llandudno Bay Hotel site?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 49 observed charging sessions.

Who operates Enozzle Ltd - Llandudno Bay Hotel site?

Enozzle Ltd - Llandudno Bay Hotel site is on the Enozzle Ltd - Llandudno Bay Hotel site network.

How long does a Tesla Model Y Long Range take to charge at Enozzle Ltd - Llandudno Bay Hotel site?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Enozzle Ltd - Llandudno Bay Hotel site?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Enozzle Ltd - Llandudno Bay Hotel site?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Enozzle Ltd - Llandudno Bay Hotel site · synced 13 Oct 2026