EH - MOTO Toddington Southbound · GRIDSERVE
CCS · 50 kW99% reliability3 of 3 available
CCS · 360 kW100% reliability16 of 18 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 360 kW | £0.85/kWh |
| CCS | 50 kW | £0.85/kWh |
| CHAdeMO | 50 kW | £0.85/kWh |
| Type 2 | 11 kW | £0.59/kWh |
How much does it cost to charge at EH - MOTO Toddington Southbound · GRIDSERVE?
The operator's published price is CCS £0.85/kWh · CHAdeMO £0.85/kWh · CCS £0.85/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at EH - MOTO Toddington Southbound · GRIDSERVE?
Up to 360 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does EH - MOTO Toddington Southbound · GRIDSERVE have?
23 charging sockets: 3 × 50 kW CCS, 1 × 50 kW CHAdeMO, 18 × 360 kW CCS, 1 × 11 kW Type 2. Live per-socket availability is shown on this page.
Is EH - MOTO Toddington Southbound · GRIDSERVE open 24/7?
Yes - EH - MOTO Toddington Southbound · GRIDSERVE is open 24 hours a day, 7 days a week.
When is EH - MOTO Toddington Southbound · GRIDSERVE busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is EH - MOTO Toddington Southbound · GRIDSERVE?
Amp Map measured 99.5% uptime here from recorded live status over the last 30 days, across 3401 observed charging sessions.
Who operates EH - MOTO Toddington Southbound · GRIDSERVE?
EH - MOTO Toddington Southbound · GRIDSERVE is on the GRIDSERVE network.
How long does a Tesla Model Y Long Range take to charge at EH - MOTO Toddington Southbound · GRIDSERVE?
A typical 10–80% rapid charge takes about 21 min on the 360 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Toddington Southbound · GRIDSERVE?
A typical 10–80% rapid charge takes about 23 min on the 360 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Toddington Southbound · GRIDSERVE?
A typical 10–80% rapid charge takes about 39 min on the 360 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.