HU - Mollies Bristol · GRIDSERVE
CCS · 100 kW99% reliability3 of 5 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 100 kW | £0.92/kWh |
| CHAdeMO | 75 kW | £0.92/kWh |
| Type 2 | 11 kW | £0.59/kWh |
How much does it cost to charge at HU - Mollies Bristol · GRIDSERVE?
The operator's published price is CCS £0.92/kWh · CHAdeMO £0.92/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at HU - Mollies Bristol · GRIDSERVE?
Up to 100 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does HU - Mollies Bristol · GRIDSERVE have?
7 charging sockets: 5 × 100 kW CCS, 1 × 75 kW CHAdeMO, 1 × 11 kW Type 2. Live per-socket availability is shown on this page.
Is HU - Mollies Bristol · GRIDSERVE open 24/7?
Yes - HU - Mollies Bristol · GRIDSERVE is open 24 hours a day, 7 days a week.
When is HU - Mollies Bristol · GRIDSERVE busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is HU - Mollies Bristol · GRIDSERVE?
Amp Map measured 99.6% uptime here from recorded live status over the last 30 days, across 415 observed charging sessions.
Who operates HU - Mollies Bristol · GRIDSERVE?
HU - Mollies Bristol · GRIDSERVE is on the GRIDSERVE network.
How long does a Tesla Model Y Long Range take to charge at HU - Mollies Bristol · GRIDSERVE?
A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Mollies Bristol · GRIDSERVE?
A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at HU - Mollies Bristol · GRIDSERVE?
A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.