HU - Dobbies Swindon · GRIDSERVE
CCS · 180 kW99% reliability8 of 8 available
CHAdeMO · 80 kW97% reliability2 of 2 available
Type 2 · 22 kW98% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at HU - Dobbies Swindon · GRIDSERVE?
The operator's published price is £0.85/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at HU - Dobbies Swindon · GRIDSERVE?
Up to 350 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does HU - Dobbies Swindon · GRIDSERVE have?
14 charging sockets: 8 × 180 kW CCS, 2 × 80 kW CHAdeMO, 2 × 22 kW Type 2, 2 × 350 kW CCS, 1 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.
Is HU - Dobbies Swindon · GRIDSERVE open 24/7?
Yes - HU - Dobbies Swindon · GRIDSERVE is open 24 hours a day, 7 days a week.
When is HU - Dobbies Swindon · GRIDSERVE busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.
How reliable is HU - Dobbies Swindon · GRIDSERVE?
Amp Map measured 98.5% uptime here from recorded live status over the last 30 days, across 582 observed charging sessions.
Who operates HU - Dobbies Swindon · GRIDSERVE?
HU - Dobbies Swindon · GRIDSERVE is on the GRIDSERVE network.
How long does a Tesla Model Y Long Range take to charge at HU - Dobbies Swindon · GRIDSERVE?
A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Dobbies Swindon · GRIDSERVE?
A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at HU - Dobbies Swindon · GRIDSERVE?
A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.