Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 12 May 2024

Provide CIC HQ · EB Charging

900 The Crescent, CO4 9YQ
Rate this charger
Network: EB Charging
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 27 kW2 sockets
Type 27 kW2 sockets
Location info
PriceMinimum 1 Pound.
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessCustomers only
NotesChargepoints are not identified. Authorisation appears to allow you to connect to any socket so they are networked. ensure you are not paying for all chargers simultaneously.
Getting therelook for 900 The Crescent
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Provide CIC HQ · EB Charging?

The operator's published price is Minimum 1 Pound.. Prices come from the operator's own data feed and can change.

How fast is charging at Provide CIC HQ · EB Charging?

Up to 7 kW AC via Type 2.

How many charging sockets does Provide CIC HQ · EB Charging have?

4 charging sockets: 2 × 7 kW Type 2, 2 × 7 kW Type 2.

Who operates Provide CIC HQ · EB Charging?

Provide CIC HQ · EB Charging is on the EB Charging network. For site issues, the operator lists +44 1727 807 263.

Can anyone charge at Provide CIC HQ · EB Charging?

The operator lists this charger for customers of the site.

How long does a Tesla Model Y Long Range take to charge at Provide CIC HQ · EB Charging?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Provide CIC HQ · EB Charging?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Provide CIC HQ · EB Charging?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 12 May 2024