Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 16 Nov 2019

Powick Road · E.ON (DE)

Powick Road, B23 7PG
Rate this charger
Network: E.ON (DE)
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CCS175 kW2 sockets
CHAdeMO100 kW2 sockets
Location info
Price£0.43/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · pay at location
NotesE.ON Drive UK, two 175kW units, pay by contactless, E.ON Drive app, RFID card or www.eonevpay.co.uk
Getting thereLocated in the Esso Petrol Station
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Powick Road · E.ON (DE)?

The operator's published price is £0.43/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Powick Road · E.ON (DE)?

Up to 175 kW DC via CCS, CHAdeMO.

How many charging sockets does Powick Road · E.ON (DE) have?

2 charging sockets: 2 × 175 kW CCS, 2 × 100 kW CHAdeMO.

Who operates Powick Road · E.ON (DE)?

Powick Road · E.ON (DE) is on the E.ON (DE) network. For site issues, the operator lists 0333 202 4417.

How long does a Tesla Model Y Long Range take to charge at Powick Road · E.ON (DE)?

A typical 10–80% rapid charge takes about 24 min on the 175 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Powick Road · E.ON (DE)?

A typical 10–80% rapid charge takes about 23 min on the 175 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Powick Road · E.ON (DE)?

A typical 10–80% rapid charge takes about 39 min on the 175 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 175 kW CCS~24 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 175 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 175 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 175 kW CCS~21 min
MG Motor MG4 Trophy 10–80% · 175 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 175 kW CCS~39 min
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 16 Nov 2019