MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 12 Jan 2024
Teesbay Retail Park 1 · E.ON Drive
16 Brenda Road, TS25 1XJ
Rate this charger
Network: E.ON Drive
Always check directly with the charge point operator for the most up-to-date information.
Connectors
300 kW1 socket
60 kW1 socket
300 kW1 socket
Location info
AccessPublic
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Teesbay Retail Park 1 · E.ON Drive?
Up to 300 kW DC via CCS, CHAdeMO.
How many charging sockets does Teesbay Retail Park 1 · E.ON Drive have?
3 charging sockets: 1 × 300 kW CCS, 1 × 60 kW CHAdeMO, 1 × 300 kW CCS.
Who operates Teesbay Retail Park 1 · E.ON Drive?
Teesbay Retail Park 1 · E.ON Drive is on the E.ON Drive network.
How long does a Tesla Model Y Long Range take to charge at Teesbay Retail Park 1 · E.ON Drive?
A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Teesbay Retail Park 1 · E.ON Drive?
A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Teesbay Retail Park 1 · E.ON Drive?
A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min
Nissan LEAF 10–80% · 60 kW CHAdeMO~54 min
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 12 Jan 2024