Derby Airfield
Type 2 · 7 kW100% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How fast is charging at Derby Airfield?
Up to 7 kW AC via Type 2.
How many charging sockets does Derby Airfield have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Derby Airfield open?
Opening hours: Mon–Sun 09:00–17:00.
When is Derby Airfield busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Derby Airfield?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 11 observed charging sessions.
Who operates Derby Airfield?
Derby Airfield is on the Derby Airfield network.
How long does a Tesla Model Y Long Range take to charge at Derby Airfield?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Derby Airfield?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Derby Airfield?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.