Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 10 of 10VerifiedDAERA Portal Control supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

DAERA Portal Control

21 Dargan Dr, BT3 9JG · Open 24h
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 7 kW100% reliability10 of 10 available
DKF50094-1100% reliabilityAvailable
DKF50094-2100% reliabilityAvailable
DLB57694-1100% reliabilityAvailable
DLB57694-2100% reliabilityAvailable
DNC63576-199% reliabilityAvailable
DNC63576-2100% reliabilityAvailable
ROLEC_DKC93862-1100% reliabilityAvailable
ROLEC_DKC93862-2100% reliabilityAvailable
ROLEC_DMD45441-1100% reliabilityAvailable
ROLEC_DMD45441-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 25 days.

Location info
HoursOpen 24 hours
PaymentApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 11pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at DAERA Portal Control?

Up to 7 kW AC via Type 2.

How many charging sockets does DAERA Portal Control have?

10 charging sockets: 10 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is DAERA Portal Control open 24/7?

Yes - DAERA Portal Control is open 24 hours a day, 7 days a week.

When is DAERA Portal Control busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 pm and quietest around 1 pm. The live status on this page shows what is free before you set off.

How reliable is DAERA Portal Control?

Amp Map measured 99.9% uptime here from recorded live status over the last 30 days, across 19 observed charging sessions.

Who operates DAERA Portal Control?

DAERA Portal Control is on the DAERA Portal Control network.

How long does a Tesla Model Y Long Range take to charge at DAERA Portal Control?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at DAERA Portal Control?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at DAERA Portal Control?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: DAERA Portal Control · synced 13 Oct 2026