Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 9 Sept 2024

Woolgate Car Park · Connected Kerb

Market Square, OX28 4WX
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 26 kW1 socket
Type 26 kW1 socket
Type 26 kW1 socket
Type 26 kW1 socket
Type 26 kW1 socket
Type 26 kW1 socket
Type 26 kW1 socket
Type 26 kW1 socket
CCS75 kW1 socket
CCS75 kW1 socket
CCS75 kW1 socket
CCS75 kW1 socket
Location info
PriceAC: £0.48/kWh; DC: £0.67/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic
NotesDC chargers are fitted with Contactless payment terminals. AC chargepoints will require RFID, App or QR code scan
Facilities
Car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Woolgate Car Park · Connected Kerb?

The operator's published price is AC: £0.48/kWh; DC: £0.67/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Woolgate Car Park · Connected Kerb?

Up to 75 kW DC via Type 2, CCS.

How many charging sockets does Woolgate Car Park · Connected Kerb have?

12 charging sockets: 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 75 kW CCS, 1 × 75 kW CCS, 1 × 75 kW CCS, 1 × 75 kW CCS.

Who operates Woolgate Car Park · Connected Kerb?

Woolgate Car Park · Connected Kerb is on the Connected Kerb network.

How long does a Tesla Model Y Long Range take to charge at Woolgate Car Park · Connected Kerb?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Woolgate Car Park · Connected Kerb?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Woolgate Car Park · Connected Kerb?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min
Nissan LEAF 10–80% · 6 kW Type 2~4h 40m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 9 Sept 2024