MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 13 Feb 2023
Civic Center Visitors Car Park 1 · Connected Kerb
Civic Center Visitors Car Park 1, CT20 2QY
Rate this charger
Network: Connected Kerb
Always check directly with the charge point operator for the most up-to-date information.
Connectors
22 kW1 socket
22 kW1 socket
Location info
AccessPublic
Find itStreet View of this spot ↗
Facilities
Car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Civic Center Visitors Car Park 1 · Connected Kerb?
Up to 22 kW AC via Type 2.
How many charging sockets does Civic Center Visitors Car Park 1 · Connected Kerb have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Civic Center Visitors Car Park 1 · Connected Kerb?
Civic Center Visitors Car Park 1 · Connected Kerb is on the Connected Kerb network.
How long does a Tesla Model Y Long Range take to charge at Civic Center Visitors Car Park 1 · Connected Kerb?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Civic Center Visitors Car Park 1 · Connected Kerb?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Civic Center Visitors Car Park 1 · Connected Kerb?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 13 Feb 2023