Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 9 Jul 2026

Bicknell Road · Clenergy

Bicknell Road, SE5 9AU
Rate this charger
Network: Clenergy
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 26 kW1 socket
Location info
AccessPublic
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Bicknell Road · Clenergy?

Up to 6 kW AC via Type 2.

How many charging sockets does Bicknell Road · Clenergy have?

1 charging socket: 1 × 6 kW Type 2.

Who operates Bicknell Road · Clenergy?

Bicknell Road · Clenergy is on the Clenergy network.

How long does a Tesla Model Y Long Range take to charge at Bicknell Road · Clenergy?

A 10–80% charge takes about 9h 13m on the 6 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bicknell Road · Clenergy?

A 10–80% charge takes about 6h 39m on the 6 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Bicknell Road · Clenergy?

A 10–80% charge takes about 8h 31m on the 6 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 6 kW Type 2~9h 13m
Tesla Model 3 Rear-Wheel Drive 10–80% · 6 kW Type 2~6h 39m
Audi Q4 e-tron 50 10–80% · 6 kW Type 2~8h 31m
Hyundai IONIQ 5 10–80% · 6 kW Type 2~8h 28m
MG Motor MG4 Trophy 10–80% · 6 kW Type 2~7h 7m
Hyundai Kona Electric Long Range 10–80% · 6 kW Type 2~6h 46m
Nissan LEAF 10–80% · 6 kW Type 2~4h 40m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 9 Jul 2026