MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 13 Oct 2018
Charles Street Car Park
Charles Street, SR1 1XB
Rate this charger
Connectors
50 kW1 socket
50 kW1 socket
43 kW1 socket
Location info
Price25p/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · membership required · access key required
NotesElectric Blue charger.
Find itStreet View of this spot ↗
Facilities
Car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Charles Street Car Park?
The operator's published price is 25p/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Charles Street Car Park?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Charles Street Car Park have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.
How long does a Tesla Model Y Long Range take to charge at Charles Street Car Park?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Charles Street Car Park?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Charles Street Car Park?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 13 Oct 2018