Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 9 Sept 2024

EV Point, Baynards Green · ChargePoint

B4100, OX27 7SG
Rate this charger
Network: ChargePoint
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CCS150 kW1 socket
CCS150 kW1 socket
CCS150 kW1 socket
CCS150 kW1 socket
Location info
Price£0.65/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · pay at location
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at EV Point, Baynards Green · ChargePoint?

The operator's published price is £0.65/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at EV Point, Baynards Green · ChargePoint?

Up to 150 kW DC via CCS.

How many charging sockets does EV Point, Baynards Green · ChargePoint have?

4 charging sockets: 1 × 150 kW CCS, 1 × 150 kW CCS, 1 × 150 kW CCS, 1 × 150 kW CCS.

Who operates EV Point, Baynards Green · ChargePoint?

EV Point, Baynards Green · ChargePoint is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.

How long does a Tesla Model Y Long Range take to charge at EV Point, Baynards Green · ChargePoint?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EV Point, Baynards Green · ChargePoint?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EV Point, Baynards Green · ChargePoint?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 9 Sept 2024