Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 29 Oct 2018

Nhs Western Isles, Health Board Office, Stornoway · Chargeplace Scotland

Nhs Western Isles, Health Board Office, Stornoway, HS1 2BN
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 222 kW2 sockets
Location info
PriceFree
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · membership required · access key required
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Nhs Western Isles, Health Board Office, Stornoway · Chargeplace Scotland?

The operator's published price is Free. Prices come from the operator's own data feed and can change.

How fast is charging at Nhs Western Isles, Health Board Office, Stornoway · Chargeplace Scotland?

Up to 22 kW AC via Type 2.

How many charging sockets does Nhs Western Isles, Health Board Office, Stornoway · Chargeplace Scotland have?

2 charging sockets: 2 × 22 kW Type 2.

Who operates Nhs Western Isles, Health Board Office, Stornoway · Chargeplace Scotland?

Nhs Western Isles, Health Board Office, Stornoway · Chargeplace Scotland is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

How long does a Tesla Model Y Long Range take to charge at Nhs Western Isles, Health Board Office, Stornoway · Chargeplace Scotland?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nhs Western Isles, Health Board Office, Stornoway · Chargeplace Scotland?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Nhs Western Isles, Health Board Office, Stornoway · Chargeplace Scotland?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 29 Oct 2018