Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 5 May 2023

Newtown St Boswells · Chargeplace Scotland

Old School Building, TD6 0SA
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CHAdeMO50 kW1 socket
Location info
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Newtown St Boswells · Chargeplace Scotland?

Up to 50 kW DC via CHAdeMO.

How many charging sockets does Newtown St Boswells · Chargeplace Scotland have?

1 charging socket: 1 × 50 kW CHAdeMO.

Who operates Newtown St Boswells · Chargeplace Scotland?

Newtown St Boswells · Chargeplace Scotland is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

How long does a Nissan LEAF take to charge at Newtown St Boswells · Chargeplace Scotland?

A typical 10–80% rapid charge takes about 55 min on the 50 kW CHAdeMO here, adding roughly 28 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 5 May 2023