Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
OfflineCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 1 Apr 2020

Gretna Train Station, Glasgow Road, Gretna Green · Chargeplace Scotland

Gretna Train Station, Glasgow Road, Gretna Green, DG16 5HF
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 27 kW2 sockets
Location info
PriceFree
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · membership required · access key required
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Gretna Train Station, Glasgow Road, Gretna Green · Chargeplace Scotland?

The operator's published price is Free. Prices come from the operator's own data feed and can change.

How fast is charging at Gretna Train Station, Glasgow Road, Gretna Green · Chargeplace Scotland?

Up to 7 kW AC via Type 2.

How many charging sockets does Gretna Train Station, Glasgow Road, Gretna Green · Chargeplace Scotland have?

2 charging sockets: 2 × 7 kW Type 2.

Who operates Gretna Train Station, Glasgow Road, Gretna Green · Chargeplace Scotland?

Gretna Train Station, Glasgow Road, Gretna Green · Chargeplace Scotland is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

How long does a Tesla Model Y Long Range take to charge at Gretna Train Station, Glasgow Road, Gretna Green · Chargeplace Scotland?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gretna Train Station, Glasgow Road, Gretna Green · Chargeplace Scotland?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Gretna Train Station, Glasgow Road, Gretna Green · Chargeplace Scotland?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 1 Apr 2020