Falls of Shin Community Project, Lairg · Chargeplace Scotland
How much does it cost to charge at Falls of Shin Community Project, Lairg · Chargeplace Scotland?
The operator's published price is Free. Prices come from the operator's own data feed and can change.
How fast is charging at Falls of Shin Community Project, Lairg · Chargeplace Scotland?
Up to 22 kW AC via Type 2, CCS, CHAdeMO.
How many charging sockets does Falls of Shin Community Project, Lairg · Chargeplace Scotland have?
1 charging socket: 1 × 22 kW Type 2, 1 × 22 kW CCS, 1 × 22 kW CHAdeMO.
Who operates Falls of Shin Community Project, Lairg · Chargeplace Scotland?
Falls of Shin Community Project, Lairg · Chargeplace Scotland is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
How long does a Tesla Model Y Long Range take to charge at Falls of Shin Community Project, Lairg · Chargeplace Scotland?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Falls of Shin Community Project, Lairg · Chargeplace Scotland?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Falls of Shin Community Project, Lairg · Chargeplace Scotland?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.