Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 1 Apr 2020

Duke Street Car Park · Chargeplace Scotland

92 Duke Street, G4 0UG
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 27 kW8 sockets
CCS50 kW3 sockets
CHAdeMO50 kW3 sockets
Type 243 kW3 sockets
Location info
PriceFree. Sign in at office to get free exit pass
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · membership required · access key required
Getting thereOn level B (Entry level, on the left). Sign in/out at office for free parking.
Facilities
Car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Duke Street Car Park · Chargeplace Scotland?

The operator's published price is Free. Sign in at office to get free exit pass. Prices come from the operator's own data feed and can change.

How fast is charging at Duke Street Car Park · Chargeplace Scotland?

Up to 50 kW DC via Type 2, CCS, CHAdeMO.

How many charging sockets does Duke Street Car Park · Chargeplace Scotland have?

8 charging sockets: 8 × 7 kW Type 2, 3 × 50 kW CCS, 3 × 50 kW CHAdeMO, 3 × 43 kW Type 2.

Who operates Duke Street Car Park · Chargeplace Scotland?

Duke Street Car Park · Chargeplace Scotland is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

How long does a Tesla Model Y Long Range take to charge at Duke Street Car Park · Chargeplace Scotland?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Duke Street Car Park · Chargeplace Scotland?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Duke Street Car Park · Chargeplace Scotland?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 1 Apr 2020