Soresby Street Car Park · BP Pulse
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Soresby Street Car Park · BP Pulse?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Soresby Street Car Park · BP Pulse?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Soresby Street Car Park · BP Pulse have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 25 kW Type 2. Live per-socket availability is shown on this page.
When is Soresby Street Car Park · BP Pulse busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 8 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Soresby Street Car Park · BP Pulse?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 4 observed charging sessions.
Who operates Soresby Street Car Park · BP Pulse?
Soresby Street Car Park · BP Pulse is on the BP Pulse network.
How long does a Tesla Model Y Long Range take to charge at Soresby Street Car Park · BP Pulse?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Soresby Street Car Park · BP Pulse?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Soresby Street Car Park · BP Pulse?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.