Manchester Regional Tennis Centre · Be.EV
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 51 kW | £0.77/kWh |
| CHAdeMO | 51 kW | £0.77/kWh |
| Type 2 | 22 kW | £0.59/kWh |
How much does it cost to charge at Manchester Regional Tennis Centre · Be.EV?
The operator's published price is CCS £0.77/kWh · CHAdeMO £0.77/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Manchester Regional Tennis Centre · Be.EV?
Up to 51 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Manchester Regional Tennis Centre · Be.EV have?
3 charging sockets: 1 × 51 kW CCS, 1 × 51 kW CHAdeMO, 1 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Manchester Regional Tennis Centre · Be.EV open 24/7?
Yes - Manchester Regional Tennis Centre · Be.EV is open 24 hours a day, 7 days a week.
When is Manchester Regional Tennis Centre · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Manchester Regional Tennis Centre · Be.EV?
Amp Map measured 96.7% uptime here from recorded live status over the last 30 days, across 60 observed charging sessions.
Who operates Manchester Regional Tennis Centre · Be.EV?
Manchester Regional Tennis Centre · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Manchester Regional Tennis Centre · Be.EV?
A typical 10–80% rapid charge takes about 68 min on the 51 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Manchester Regional Tennis Centre · Be.EV?
A typical 10–80% rapid charge takes about 50 min on the 51 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Manchester Regional Tennis Centre · Be.EV?
A typical 10–80% rapid charge takes about 65 min on the 51 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.