Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
OfflineCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 8 Aug 2019

Belmont Park and Ride · Charge Your Car

Carrville, DH1 1SR
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 27 kW1 socket
CHAdeMO50 kW1 socket
Type 222 kW1 socket
BS1363 3 Pin 13 Amp3 kW1 socket
Location info
Price£1.00/session
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · membership required · access key required
NotesMust be using Park & Ride
Getting thereOnly available 7am - 7pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Belmont Park and Ride · Charge Your Car?

The operator's published price is £1.00/session. Prices come from the operator's own data feed and can change.

How fast is charging at Belmont Park and Ride · Charge Your Car?

Up to 50 kW DC via Type 2, CHAdeMO, BS1363 3 Pin 13 Amp.

How many charging sockets does Belmont Park and Ride · Charge Your Car have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

Who operates Belmont Park and Ride · Charge Your Car?

Belmont Park and Ride · Charge Your Car is on the Charge Your Car network. For site issues, the operator lists 0191 26 50 500.

How long does a Tesla Model Y Long Range take to charge at Belmont Park and Ride · Charge Your Car?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Belmont Park and Ride · Charge Your Car?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Belmont Park and Ride · Charge Your Car?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 8 Aug 2019