Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 Jul 2023

Spencer Park · Char.gy

Spencer Park, CV5 6NQ
Rate this charger
Network: Char.gy
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 24 kW1 socket
Type 23 kW1 socket
Type 24 kW1 socket
Type 24 kW1 socket
Type 24 kW1 socket
Type 23 kW1 socket
Type 24 kW1 socket
Type 24 kW1 socket
Location info
PriceDay (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic
NotesCan also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
Getting thereMon - Sat, 8am - 6pm: EA Permit Holders Only OR 3 hours, no return within 3 hours
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Spencer Park · Char.gy?

The operator's published price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Spencer Park · Char.gy?

Up to 4 kW AC via Type 2.

How many charging sockets does Spencer Park · Char.gy have?

2 charging sockets: 1 × 4 kW Type 2, 1 × 3 kW Type 2, 1 × 4 kW Type 2, 1 × 4 kW Type 2, 1 × 4 kW Type 2, 1 × 3 kW Type 2, 1 × 4 kW Type 2, 1 × 4 kW Type 2.

Who operates Spencer Park · Char.gy?

Spencer Park · Char.gy is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

How long does a Tesla Model Y Long Range take to charge at Spencer Park · Char.gy?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Spencer Park · Char.gy?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Spencer Park · Char.gy?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 4 kW Type 2~13h 50m
Tesla Model 3 Rear-Wheel Drive 10–80% · 4 kW Type 2~9h 59m
Audi Q4 e-tron 50 10–80% · 4 kW Type 2~12h 46m
Hyundai IONIQ 5 10–80% · 4 kW Type 2~12h 42m
MG Motor MG4 Trophy 10–80% · 4 kW Type 2~10h 40m
Hyundai Kona Electric Long Range 10–80% · 4 kW Type 2~10h 9m
Nissan LEAF 10–80% · 4 kW Type 2~7h 0m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 Jul 2023