Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 1 Mar 2023

70 Tatum Street · Char.gy

70 Tatum Street, SE17 1QR
Rate this charger
Network: Char.gy
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 25 kW1 socket
Location info
PriceDay (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic
NotesCan also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
Getting thereM1 Permit Holders Only: Mon - Fri, 08:30 - 18:30
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at 70 Tatum Street · Char.gy?

The operator's published price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at 70 Tatum Street · Char.gy?

Up to 5 kW AC via Type 2.

How many charging sockets does 70 Tatum Street · Char.gy have?

1 charging socket: 1 × 5 kW Type 2.

Who operates 70 Tatum Street · Char.gy?

70 Tatum Street · Char.gy is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

How long does a Tesla Model Y Long Range take to charge at 70 Tatum Street · Char.gy?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 70 Tatum Street · Char.gy?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at 70 Tatum Street · Char.gy?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 5 kW Type 2~11h 4m
Tesla Model 3 Rear-Wheel Drive 10–80% · 5 kW Type 2~7h 59m
Audi Q4 e-tron 50 10–80% · 5 kW Type 2~10h 13m
Hyundai IONIQ 5 10–80% · 5 kW Type 2~10h 10m
MG Motor MG4 Trophy 10–80% · 5 kW Type 2~8h 32m
Hyundai Kona Electric Long Range 10–80% · 5 kW Type 2~8h 7m
Nissan LEAF 10–80% · 5 kW Type 2~5h 36m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 1 Mar 2023