Busy Bee
Reliability is the share of time each socket was not out of order, over the last 30 days.
How fast is charging at Busy Bee?
Up to 40 kW DC via CCS.
How many charging sockets does Busy Bee have?
1 charging socket: 1 × 40 kW CCS. Live per-socket availability is shown on this page.
Is Busy Bee open 24/7?
Yes - Busy Bee is open 24 hours a day, 7 days a week.
When is Busy Bee busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 6 am and quietest around 2 pm. The live status on this page shows what is free before you set off.
How reliable is Busy Bee?
Amp Map measured 99.3% uptime here from recorded live status over the last 30 days, across 58 observed charging sessions.
Who operates Busy Bee?
Busy Bee is on the Busy Bee network.
How long does a Tesla Model Y Long Range take to charge at Busy Bee?
A typical 10–80% rapid charge takes about 87 min on the 40 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Busy Bee?
A typical 10–80% rapid charge takes about 63 min on the 40 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Busy Bee?
A typical 10–80% rapid charge takes about 81 min on the 40 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.