Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Under maintenanceVerifiedBP Pulse supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Warren Weir Lakeside Venue · BP Pulse

Warren Weir Lakeside Venue, Luton Hoo Hotel, LU1 3TW
Rate this charger
Network: BP Pulse
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 4 kW0% reliability0 of 2 available
111560% reliabilityOut of order
111560% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.65/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
NoteNo charging outside opening hours
PaymentApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 6am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Warren Weir Lakeside Venue · BP Pulse?

The operator's published price is £0.65/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Warren Weir Lakeside Venue · BP Pulse?

Up to 4 kW AC via Type 2.

How many charging sockets does Warren Weir Lakeside Venue · BP Pulse have?

2 charging sockets: 2 × 4 kW Type 2. Live per-socket availability is shown on this page.

How reliable is Warren Weir Lakeside Venue · BP Pulse?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Warren Weir Lakeside Venue · BP Pulse?

Warren Weir Lakeside Venue · BP Pulse is on the BP Pulse network.

How long does a Tesla Model Y Long Range take to charge at Warren Weir Lakeside Venue · BP Pulse?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Warren Weir Lakeside Venue · BP Pulse?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Warren Weir Lakeside Venue · BP Pulse?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 4 kW Type 2~13h 50m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 4 kW Type 2~9h 59m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 4 kW Type 2~12h 46m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 4 kW Type 2~12h 42m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 4 kW Type 2~10h 40m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 4 kW Type 2~10h 9m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 4 kW Type 2~7h 0m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 13 Oct 2026