Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 9 of 9VerifiedBP Pulse supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 31 Oct 2026

UK | 0U0BW | Perivale SF Connect, Western Avenue, Greenford, UB6 8TF, London #BPA0257 · BP Pulse

Western Avenue, UB6 8TF · Open 24h
Rate this charger
Network: BP Pulse
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 300 kW97% reliability6 of 6 available
BPA025797% reliabilityAvailable
BPA025797% reliabilityAvailable
BPA025896% reliabilityAvailable
BPA025896% reliabilityAvailable
BPA025996% reliabilityAvailable
BPA025996% reliabilityAvailable
CHAdeMO · 100 kW97% reliability3 of 3 available
BPA025797% reliabilityAvailable
BPA025896% reliabilityAvailable
BPA025996% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
HoursOpen 24 hours
PaymentCredit cardApp start/stopReservableRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 8pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at UK | 0U0BW | Perivale SF Connect, Western Avenue, Greenford, UB6 8TF, London #BPA0257 · BP Pulse?

Up to 300 kW DC via CCS, CHAdeMO.

How many charging sockets does UK | 0U0BW | Perivale SF Connect, Western Avenue, Greenford, UB6 8TF, London #BPA0257 · BP Pulse have?

9 charging sockets: 6 × 300 kW CCS, 3 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

Is UK | 0U0BW | Perivale SF Connect, Western Avenue, Greenford, UB6 8TF, London #BPA0257 · BP Pulse open 24/7?

Yes - UK | 0U0BW | Perivale SF Connect, Western Avenue, Greenford, UB6 8TF, London #BPA0257 · BP Pulse is open 24 hours a day, 7 days a week.

When is UK | 0U0BW | Perivale SF Connect, Western Avenue, Greenford, UB6 8TF, London #BPA0257 · BP Pulse busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is UK | 0U0BW | Perivale SF Connect, Western Avenue, Greenford, UB6 8TF, London #BPA0257 · BP Pulse?

Amp Map measured 97.5% uptime here from recorded live status over the last 30 days, across 928 observed charging sessions.

Who operates UK | 0U0BW | Perivale SF Connect, Western Avenue, Greenford, UB6 8TF, London #BPA0257 · BP Pulse?

UK | 0U0BW | Perivale SF Connect, Western Avenue, Greenford, UB6 8TF, London #BPA0257 · BP Pulse is on the BP Pulse network.

How long does a Tesla Model Y Long Range take to charge at UK | 0U0BW | Perivale SF Connect, Western Avenue, Greenford, UB6 8TF, London #BPA0257 · BP Pulse?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at UK | 0U0BW | Perivale SF Connect, Western Avenue, Greenford, UB6 8TF, London #BPA0257 · BP Pulse?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at UK | 0U0BW | Perivale SF Connect, Western Avenue, Greenford, UB6 8TF, London #BPA0257 · BP Pulse?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 31 Oct 2026