Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Under maintenanceVerifiedBe.EV supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Shrewsbury Road Car Park · Be.EV

Shrewsbury Road Car Park, S36 6DY
Rate this charger
Network: Be.EV
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 22 kW0% reliability0 of 4 available
AD00935-10% reliabilityOut of order
AD00935-20% reliabilityOut of order
AD00936-10% reliabilityOut of order
AD00936-20% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.64/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
NoteNo charging outside opening hours
ParkingCar park
PaymentApp start/stop
Facilities
Car park
Still collecting data for Mondays - check back soon.
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Shrewsbury Road Car Park · Be.EV?

The operator's published price is £0.64/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Shrewsbury Road Car Park · Be.EV?

Up to 22 kW AC via Type 2.

How many charging sockets does Shrewsbury Road Car Park · Be.EV have?

4 charging sockets: 4 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Shrewsbury Road Car Park · Be.EV open 24/7?

Yes - Shrewsbury Road Car Park · Be.EV is open 24 hours a day, 7 days a week.

How reliable is Shrewsbury Road Car Park · Be.EV?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Shrewsbury Road Car Park · Be.EV?

Shrewsbury Road Car Park · Be.EV is on the Be.EV network.

How long does a Tesla Model Y Long Range take to charge at Shrewsbury Road Car Park · Be.EV?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shrewsbury Road Car Park · Be.EV?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Shrewsbury Road Car Park · Be.EV?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£35
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£27
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 13 Oct 2026