Queensway North SF Connect · BP Pulse
CCS · 300 kW98% reliability2 of 4 available
CHAdeMO · 100 kW98% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How fast is charging at Queensway North SF Connect · BP Pulse?
Up to 300 kW DC via CHAdeMO, CCS.
How many charging sockets does Queensway North SF Connect · BP Pulse have?
6 charging sockets: 2 × 100 kW CHAdeMO, 4 × 300 kW CCS. Live per-socket availability is shown on this page.
Is Queensway North SF Connect · BP Pulse open 24/7?
Yes - Queensway North SF Connect · BP Pulse is open 24 hours a day, 7 days a week.
When is Queensway North SF Connect · BP Pulse busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Queensway North SF Connect · BP Pulse?
Amp Map measured 98.3% uptime here from recorded live status over the last 30 days, across 374 observed charging sessions.
Who operates Queensway North SF Connect · BP Pulse?
Queensway North SF Connect · BP Pulse is on the BP Pulse network.
How long does a Tesla Model Y Long Range take to charge at Queensway North SF Connect · BP Pulse?
A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Queensway North SF Connect · BP Pulse?
A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Queensway North SF Connect · BP Pulse?
A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.