Outside Bannatynes Gym · BP Pulse
CCS · 50 kW0% reliability0 of 3 available
Type 2 · 7 kW43% reliability0 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | £0.89/kWh |
| CHAdeMO | 50 kW | £0.89/kWh |
| Type 2 | 7 kW | £0.65/kWh |
How much does it cost to charge at Outside Bannatynes Gym · BP Pulse?
The operator's published price is CCS £0.89/kWh · Type 2 £0.65/kWh · CHAdeMO £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Outside Bannatynes Gym · BP Pulse?
Up to 50 kW DC via CCS, Type 2, CHAdeMO.
How many charging sockets does Outside Bannatynes Gym · BP Pulse have?
6 charging sockets: 3 × 50 kW CCS, 2 × 7 kW Type 2, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
When is Outside Bannatynes Gym · BP Pulse busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Outside Bannatynes Gym · BP Pulse?
Amp Map measured 13.3% uptime here from recorded live status over the last 30 days, across 40 observed charging sessions.
Who operates Outside Bannatynes Gym · BP Pulse?
Outside Bannatynes Gym · BP Pulse is on the BP Pulse network.
How long does a Tesla Model Y Long Range take to charge at Outside Bannatynes Gym · BP Pulse?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Outside Bannatynes Gym · BP Pulse?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Outside Bannatynes Gym · BP Pulse?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.