Market Sqaure Car Park · BP Pulse
Type 2 · 7 kW79% reliability2 of 4 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Market Sqaure Car Park · BP Pulse?
The operator's published price is £0.65/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Market Sqaure Car Park · BP Pulse?
Up to 7 kW AC via Type 2.
How many charging sockets does Market Sqaure Car Park · BP Pulse have?
4 charging sockets: 4 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Market Sqaure Car Park · BP Pulse busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Market Sqaure Car Park · BP Pulse?
Amp Map measured 79.3% uptime here from recorded live status over the last 30 days, across 65 observed charging sessions.
Who operates Market Sqaure Car Park · BP Pulse?
Market Sqaure Car Park · BP Pulse is on the BP Pulse network.
How long does a Tesla Model Y Long Range take to charge at Market Sqaure Car Park · BP Pulse?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Market Sqaure Car Park · BP Pulse?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Market Sqaure Car Park · BP Pulse?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.