Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 8 of 8VerifiedBP Pulse supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

M&S Chepstow · BP Pulse

Thomas Street, NP16 5DH · Open 24h
Rate this charger
Network: BP Pulse
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CHAdeMO · 50 kW84% reliability4 of 4 available
BPT25292% reliabilityAvailable
BPT25346% reliabilityAvailable
BPT25499% reliabilityAvailable
BPT25599% reliabilityAvailable
CCS · 50 kW84% reliability4 of 4 available
BPT25292% reliabilityAvailable
BPT25346% reliabilityAvailable
BPT25499% reliabilityAvailable
BPT25599% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
HoursOpen 24 hours
PaymentCredit cardApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 12pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at M&S Chepstow · BP Pulse?

Up to 50 kW DC via CHAdeMO, CCS.

How many charging sockets does M&S Chepstow · BP Pulse have?

8 charging sockets: 4 × 50 kW CHAdeMO, 4 × 50 kW CCS. Live per-socket availability is shown on this page.

Is M&S Chepstow · BP Pulse open 24/7?

Yes - M&S Chepstow · BP Pulse is open 24 hours a day, 7 days a week.

When is M&S Chepstow · BP Pulse busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is M&S Chepstow · BP Pulse?

Amp Map measured 85.6% uptime here from recorded live status over the last 30 days, across 169 observed charging sessions.

Who operates M&S Chepstow · BP Pulse?

M&S Chepstow · BP Pulse is on the BP Pulse network.

How long does a Tesla Model Y Long Range take to charge at M&S Chepstow · BP Pulse?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at M&S Chepstow · BP Pulse?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at M&S Chepstow · BP Pulse?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 13 Oct 2026