Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 3 of 3VerifiedBP Pulse supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

M and B Llandarcy Neath · BP Pulse

M and B Llandarcy Neath, SA10 6GZ
Rate this charger
Network: BP Pulse
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
UC25304Type 2 · 25 kW88% reliabilityAvailable
UC25304CCS · 50 kW88% reliabilityAvailable
UC25304CHAdeMO · 50 kW88% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.89/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
NoteNo charging outside opening hours
PaymentApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 5pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at M and B Llandarcy Neath · BP Pulse?

The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at M and B Llandarcy Neath · BP Pulse?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does M and B Llandarcy Neath · BP Pulse have?

3 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 25 kW Type 2. Live per-socket availability is shown on this page.

When is M and B Llandarcy Neath · BP Pulse busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is M and B Llandarcy Neath · BP Pulse?

Amp Map measured 91.9% uptime here from recorded live status over the last 30 days, across 60 observed charging sessions.

Who operates M and B Llandarcy Neath · BP Pulse?

M and B Llandarcy Neath · BP Pulse is on the BP Pulse network.

How long does a Tesla Model Y Long Range take to charge at M and B Llandarcy Neath · BP Pulse?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at M and B Llandarcy Neath · BP Pulse?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at M and B Llandarcy Neath · BP Pulse?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 13 Oct 2026