Lancaster Park and Ride Caton · BP Pulse
Type 2 · 7 kW45% reliability5 of 12 available
CHAdeMO / Type 2 / CCS · 50 kW100% reliability2 of 2 available
CCS / CHAdeMO / Type 2 · 50 kW100% reliability3 of 3 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | £0.89/kWh |
| CHAdeMO | 50 kW | £0.89/kWh |
| Type 2 | 25 kW | £0.89/kWh |
| Type 2 | 7 kW | £0.65/kWh |
How much does it cost to charge at Lancaster Park and Ride Caton · BP Pulse?
The operator's published price is CCS £0.89/kWh · CHAdeMO £0.89/kWh · Type 2 £0.89/kWh · Type 2 £0.65/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Lancaster Park and Ride Caton · BP Pulse?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Lancaster Park and Ride Caton · BP Pulse have?
18 charging sockets: 6 × 50 kW CCS, 6 × 50 kW CHAdeMO, 6 × 25 kW Type 2, 12 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Lancaster Park and Ride Caton · BP Pulse busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Lancaster Park and Ride Caton · BP Pulse?
Amp Map measured 67.8% uptime here from recorded live status over the last 30 days, across 296 observed charging sessions.
Who operates Lancaster Park and Ride Caton · BP Pulse?
Lancaster Park and Ride Caton · BP Pulse is on the BP Pulse network.
How long does a Tesla Model Y Long Range take to charge at Lancaster Park and Ride Caton · BP Pulse?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lancaster Park and Ride Caton · BP Pulse?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lancaster Park and Ride Caton · BP Pulse?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.