Lancaster Park and Ride Caton · BP Pulse
Type 2 · 7 kW83% reliability6 of 12 available
CCS / CHAdeMO / Type 2 · 50 kW100% reliability5 of 5 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | £0.89/kWh |
| CHAdeMO | 50 kW | £0.89/kWh |
| Type 2 | 25 kW | £0.89/kWh |
| Type 2 | 7 kW | £0.65/kWh |
How much does it cost to charge at Lancaster Park and Ride Caton · BP Pulse?
The operator's published price is Type 2 £0.65/kWh · CCS £0.89/kWh · CHAdeMO £0.89/kWh · Type 2 £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Lancaster Park and Ride Caton · BP Pulse?
Up to 50 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Lancaster Park and Ride Caton · BP Pulse have?
18 charging sockets: 12 × 7 kW Type 2, 6 × 50 kW CCS, 6 × 50 kW CHAdeMO, 6 × 25 kW Type 2. Live per-socket availability is shown on this page.
When is Lancaster Park and Ride Caton · BP Pulse busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Lancaster Park and Ride Caton · BP Pulse?
Amp Map measured 89.1% uptime here from recorded live status over the last 30 days, across 252 observed charging sessions.
Who operates Lancaster Park and Ride Caton · BP Pulse?
Lancaster Park and Ride Caton · BP Pulse is on the BP Pulse network.
How long does a Tesla Model Y Long Range take to charge at Lancaster Park and Ride Caton · BP Pulse?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lancaster Park and Ride Caton · BP Pulse?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lancaster Park and Ride Caton · BP Pulse?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.