Kempton Park SF Connect · BP Pulse

Kempton Park SF Connect, Staines Road East, TW16 5AW
Rate this charger
Network: BP Pulse
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 150 kW0% reliability0 of 2 available
BPG0005000% reliabilityOut of order
BPG0005000% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.89/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
NoteNo charging outside opening hours
PaymentApp start/stopRFID card
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Kempton Park SF Connect · BP Pulse?

The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Kempton Park SF Connect · BP Pulse?

Up to 150 kW DC via CCS.

How many charging sockets does Kempton Park SF Connect · BP Pulse have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

How reliable is Kempton Park SF Connect · BP Pulse?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Kempton Park SF Connect · BP Pulse?

Kempton Park SF Connect · BP Pulse is on the BP Pulse network.

How long does a Tesla Model Y Long Range take to charge at Kempton Park SF Connect · BP Pulse?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kempton Park SF Connect · BP Pulse?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Kempton Park SF Connect · BP Pulse?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 13 Oct 2026