Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 3 of 9VerifiedBP Pulse supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Hilton Newcastle Gateshead - Bottle Bank Gateshead · BP Pulse

Hilton Newcastle Gateshead - Bottle Bank Gate, NE8 2AR
Rate this charger
Network: BP Pulse
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 7 kW4% reliability0 of 4 available
FC177880% reliabilityOut of order
FC177880% reliabilityOut of order
FC177928% reliabilityOut of order
FC177928% reliabilityOut of order
CHAdeMO · 50 kW53% reliability1 of 2 available
UC2528572% reliabilityOut of order
UC2529334% reliabilityAvailable
CCS · 50 kW53% reliability1 of 2 available
UC2528572% reliabilityCharging
UC2529334% reliabilityAvailable
UC25293Type 2 · 25 kW34% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price
ConnectorPowerPrice
CCS50 kW£0.89/kWh
CHAdeMO50 kW£0.89/kWh
Type 225 kW£0.89/kWh
Type 27 kW£0.65/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
NoteNo charging outside opening hours
PaymentApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 8pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Hilton Newcastle Gateshead - Bottle Bank Gateshead · BP Pulse?

The operator's published price is Type 2 £0.65/kWh · CCS £0.89/kWh · CHAdeMO £0.89/kWh · Type 2 £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Hilton Newcastle Gateshead - Bottle Bank Gateshead · BP Pulse?

Up to 50 kW DC via Type 2, CCS, CHAdeMO.

How many charging sockets does Hilton Newcastle Gateshead - Bottle Bank Gateshead · BP Pulse have?

9 charging sockets: 4 × 7 kW Type 2, 2 × 50 kW CCS, 2 × 50 kW CHAdeMO, 1 × 25 kW Type 2. Live per-socket availability is shown on this page.

When is Hilton Newcastle Gateshead - Bottle Bank Gateshead · BP Pulse busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Hilton Newcastle Gateshead - Bottle Bank Gateshead · BP Pulse?

Amp Map measured 32.9% uptime here from recorded live status over the last 30 days, across 69 observed charging sessions.

Who operates Hilton Newcastle Gateshead - Bottle Bank Gateshead · BP Pulse?

Hilton Newcastle Gateshead - Bottle Bank Gateshead · BP Pulse is on the BP Pulse network.

How long does a Tesla Model Y Long Range take to charge at Hilton Newcastle Gateshead - Bottle Bank Gateshead · BP Pulse?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hilton Newcastle Gateshead - Bottle Bank Gateshead · BP Pulse?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Hilton Newcastle Gateshead - Bottle Bank Gateshead · BP Pulse?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 13 Oct 2026