Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Under maintenanceVerifiedBP Pulse supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Haberden SF Connect · BP Pulse

Haberden SF Connect, Rougham Road, IP33 2RN
Rate this charger
Network: BP Pulse
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 150 kW0% reliability0 of 2 available
BPG0003130% reliabilityOut of order
BPG0003130% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.89/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
NoteNo charging outside opening hours
PaymentApp start/stopRFID card
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Haberden SF Connect · BP Pulse?

The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Haberden SF Connect · BP Pulse?

Up to 150 kW DC via CCS.

How many charging sockets does Haberden SF Connect · BP Pulse have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

How reliable is Haberden SF Connect · BP Pulse?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Haberden SF Connect · BP Pulse?

Haberden SF Connect · BP Pulse is on the BP Pulse network.

How long does a Tesla Model Y Long Range take to charge at Haberden SF Connect · BP Pulse?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Haberden SF Connect · BP Pulse?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Haberden SF Connect · BP Pulse?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 13 Oct 2026