Grove Street Car Park · BP Pulse
CCS · 50 kW0% reliability0 of 4 available
CHAdeMO · 50 kW0% reliability0 of 2 available
CCS · 180 kW0% reliability0 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 180 kW | £0.89/kWh |
| CHAdeMO | 120 kW | £0.89/kWh |
| CCS | 50 kW | £0.89/kWh |
| CHAdeMO | 50 kW | £0.89/kWh |
| Type 2 | 7 kW | £0.65/kWh |
How much does it cost to charge at Grove Street Car Park · BP Pulse?
The operator's published price is CHAdeMO £0.89/kWh · CCS £0.89/kWh · CHAdeMO £0.89/kWh · CCS £0.89/kWh · Type 2 £0.65/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Grove Street Car Park · BP Pulse?
Up to 180 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Grove Street Car Park · BP Pulse have?
10 charging sockets: 1 × 120 kW CHAdeMO, 4 × 50 kW CCS, 2 × 50 kW CHAdeMO, 2 × 180 kW CCS, 1 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Grove Street Car Park · BP Pulse busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 10 pm. The live status on this page shows what is free before you set off.
How reliable is Grove Street Car Park · BP Pulse?
Amp Map measured 8.6% uptime here from recorded live status over the last 30 days, across 7 observed charging sessions.
Who operates Grove Street Car Park · BP Pulse?
Grove Street Car Park · BP Pulse is on the BP Pulse network.
How long does a Tesla Model Y Long Range take to charge at Grove Street Car Park · BP Pulse?
A typical 10–80% rapid charge takes about 24 min on the 180 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Grove Street Car Park · BP Pulse?
A typical 10–80% rapid charge takes about 23 min on the 180 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Grove Street Car Park · BP Pulse?
A typical 10–80% rapid charge takes about 39 min on the 180 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.