Glendon Bed and Breakfast · BP Pulse
Type 2 · 7 kW0% reliability0 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Glendon Bed and Breakfast · BP Pulse?
The operator's published price is £0.65/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Glendon Bed and Breakfast · BP Pulse?
Up to 7 kW AC via Type 2.
How many charging sockets does Glendon Bed and Breakfast · BP Pulse have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
How reliable is Glendon Bed and Breakfast · BP Pulse?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Glendon Bed and Breakfast · BP Pulse?
Glendon Bed and Breakfast · BP Pulse is on the BP Pulse network.
How long does a Tesla Model Y Long Range take to charge at Glendon Bed and Breakfast · BP Pulse?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Glendon Bed and Breakfast · BP Pulse?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Glendon Bed and Breakfast · BP Pulse?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.