Cransley Park EV Hub · BP Pulse
CCS · 300 kW65% reliability2 of 20 available
CHAdeMO · 100 kW65% reliability5 of 5 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How fast is charging at Cransley Park EV Hub · BP Pulse?
Up to 300 kW DC via CCS, CHAdeMO.
How many charging sockets does Cransley Park EV Hub · BP Pulse have?
25 charging sockets: 20 × 300 kW CCS, 5 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Cransley Park EV Hub · BP Pulse open 24/7?
Yes - Cransley Park EV Hub · BP Pulse is open 24 hours a day, 7 days a week.
When is Cransley Park EV Hub · BP Pulse busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Cransley Park EV Hub · BP Pulse?
Amp Map measured 72% uptime here from recorded live status over the last 30 days, across 1208 observed charging sessions.
Who operates Cransley Park EV Hub · BP Pulse?
Cransley Park EV Hub · BP Pulse is on the BP Pulse network.
How long does a Tesla Model Y Long Range take to charge at Cransley Park EV Hub · BP Pulse?
A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cransley Park EV Hub · BP Pulse?
A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cransley Park EV Hub · BP Pulse?
A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.