Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Under maintenanceVerifiedBP Pulse supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Newlands Drive Car Park · BP Pulse

Newlands Drive Car Park, Witham, CM8 2AP
Rate this charger
Network: BP Pulse
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 7 kW0% reliability0 of 8 available
148990% reliabilityOut of order
148990% reliabilityOut of order
149000% reliabilityOut of order
149000% reliabilityOut of order
149010% reliabilityOut of order
149010% reliabilityOut of order
149020% reliabilityOut of order
149020% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.65/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
NoteNo charging outside opening hours
PaymentApp start/stopRFID card
Facilities
Car park
6am9am12pm3pm6pm9pm
From live status history · busiest around 6am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Newlands Drive Car Park · BP Pulse?

The operator's published price is £0.65/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Newlands Drive Car Park · BP Pulse?

Up to 7 kW AC via Type 2.

How many charging sockets does Newlands Drive Car Park · BP Pulse have?

8 charging sockets: 8 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Newlands Drive Car Park · BP Pulse busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Newlands Drive Car Park · BP Pulse?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Newlands Drive Car Park · BP Pulse?

Newlands Drive Car Park · BP Pulse is on the BP Pulse network.

How long does a Tesla Model Y Long Range take to charge at Newlands Drive Car Park · BP Pulse?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newlands Drive Car Park · BP Pulse?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Newlands Drive Car Park · BP Pulse?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 13 Oct 2026