Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 3 of 3VerifiedBP Pulse supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Braintree SF Connect · BP Pulse

Notley Cross, CM77 7AB · Open 24h
Rate this charger
Network: BP Pulse
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 300 kW49% reliability2 of 2 available
BPA017949% reliabilityAvailable
BPA017949% reliabilityAvailable
BPA0179CHAdeMO · 100 kW49% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
HoursOpen 24 hours
PaymentCredit cardApp start/stopReservableRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 10am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Braintree SF Connect · BP Pulse?

Up to 300 kW DC via CCS, CHAdeMO.

How many charging sockets does Braintree SF Connect · BP Pulse have?

3 charging sockets: 2 × 300 kW CCS, 1 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Braintree SF Connect · BP Pulse open 24/7?

Yes - Braintree SF Connect · BP Pulse is open 24 hours a day, 7 days a week.

When is Braintree SF Connect · BP Pulse busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Braintree SF Connect · BP Pulse?

Amp Map measured 49.2% uptime here from recorded live status over the last 30 days, across 124 observed charging sessions.

Who operates Braintree SF Connect · BP Pulse?

Braintree SF Connect · BP Pulse is on the BP Pulse network.

How long does a Tesla Model Y Long Range take to charge at Braintree SF Connect · BP Pulse?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Braintree SF Connect · BP Pulse?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Braintree SF Connect · BP Pulse?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 13 Oct 2026